Adders
Residential Solar Adder Sheet | Updated 8/16/2024
Category | Item | Cost (per unit) | Unit | Notes/Description | Links | |
---|---|---|---|---|---|---|
1 | Module | JINKO 390 | 0.00 | ea | JKM390-M-72HBL-V American Assembled Black on Black | |
2 | Module | QCELL 400 G10+ | 0.15 | watt | Q.Peak Duo Black MK-G10+ 400 Black on Black | |
3 | Module | QCell 405 G10+ | 0.15 | watt | Q.Peak Duo Black MK-G10+ 405 Black on Black | |
4 | Module | JINKO 470 | 0.15 | watt | Mono- Facial Cell Module + 25 Year Warranty | |
5 | Module | QCELL 480 | 0.00 | watt | Bifacial SLV/WH + 25 year Warranty | |
6 | Module | QCELL 585 | 0.15 | watt | Bifacial SLV/WH + 25 year Warranty | |
7 | Inverter | Enphase IQ8+ | 0.00 | watt | Enphase IQ8+ Microinverter w/ 295W Continuous AC | |
8 | Inverter | Enphase IQ8M | 0.15 | watt | Enphase IQ8M Microinverter w/ 325W Continuous AC | |
9 | Storage | Enphase 5P (w/Solar) | 10,000.00 | ea | Enphase 5P Partial Home w/ IQ Controller 3 | |
10 | Storage | Enphase 5P (w/Solar) | 11,500.00 | ea | Enphase 5P Partial Home Backup w/ IQ Controller 3 w/ Generator Integration | |
11 | Storage | Enphase 5P (w/Solar) | 15,500.00 | ea | 2 Enphase 5P Batteries Whole Home Backup w/ IQ Controller 3 | |
12 | Storage | Enphase 5P (w/Solar) | 16,500.00 | ea | 2 Enphase 5P Batteries Whole Home Backup w/ IQ Controller 3 w/ Generator Integration | |
13 | Storage | Enphase 5P (Add-on) | 4,500.00 | ea | Enphase 5P Partial Home Backup Add-on with Enphase 5P | |
14 | Storage | Enphase 5P (w/o/Solar) | 14.500.00 | ea | Enphase 5P Partial Home Backup Battery Only Without Solar | |
15 | System | Micro System | 2,000.00 | ea | Micro Systems Under or Equal to 5.00kW | |
16 | System | Small System | 1,200.00 | ea | Small Systems Under or Equal to 6.00kW | |
17 | System | Ground Mount >10 | 0.60 | watt | Ironridge or Equivalent Ground Mount Over 10kW | |
17 | System | Ironridge Ground <10 | 0.80 | watt | Ironridge or Equivalent Ground Mount Under 10kW | |
18 | System | Panels Removal | 2,500.00 | ea | From 1 to 29 Panels Removal | |
19 | System | Panels Removal | Quote | ea | From 30 Panels Removal or Above | |
20 | System | Panels Removal | Quote | ea | From 30 Panels and Above & Over 60 Miles | |
21 | System | System Inspection | 400.00 | ea | 50kW Third-Party Systems and Below. Flat Amount to Inspect | |
22 | System | System Inspection | 800.00 | ea | From 50kW and up to 100kW Third-Party Systems. Flat Amount to Inspect | |
23 | System | System Inspection | 1200.00 | ea | 100kW Third-Party Systems and Up. Flat Amount to Inspect | |
24 | System | Panels Removal and Reinstall 10kW Systems and Up | 0.80 | watt | Below 8/12 Pitch, Up to 2-story Houses (Plus Adders: Roof Type, Story House, Roof Pitch) | |
25 | System | Panels Removal and Reinstall 5kW-10kW Systems | 1.2 | watt | Below 8/12 Pitch, Up to 2-story Houses (Plus Adders: Roof Type, Story House, Roof Pitch) | |
26 | System | Panels Removal and Reinstall 5kW Systems and Below | 1.6 | watt | Below 8/12 Pitch, Up to 2-story Houses (Plus Adders: Roof Type, Story House, Roof Pitch) | |
27 | Racking | Sunmodo Contour System | 25.00 | ft | Custom Design Luxury Trim | |
28 | AHJ | St Louis County | 600.00 | ea | Building Permit Process, Inspections, and Requirements from the County | |
29 | AHJ | Kansas City Structural | 350.00 | ea | Kansas City (KS & MO) Structural Assessment | |
30 | Utility | Ameren (MO & IL) | 700.00 | ea | POLARIS Taps if applicable based on system size or MSP condition after engineering review | |
31 | Roof | Special Roof Material | 0.15 | watt | Metal, Tile, Flat, S-Type, Slate, Clay | |
32 | Roof | Re-Roof | Quote | ea | Partial and Full Re-Roofs | |
33 | Roof | Three Story | 1,500.00 | ea | Homes with Three or More Stories | |
34 | Roof | Steep Roof 9/12 | 0.10 | watt | Steep Roofs with 9/12 pitch | |
35 | Roof | Steep Roof 10/12 + | 0.15 | watt | Steep Roofs with 10/12 pitch or Greater | |
36 | Service Panel | Relocate MSP | Quote | ea | Relocate Main Service Panel | |
37 | Service Panel | Relocate Meter | Quote | ea | Relocate Meter | |
38 | Service Panel | 100 Amp MPU/MPR (MO) | 4,000.00 | ea | 100 Amp Main Panel & Meter Replacement in Missouri | |
39 | Service Panel | 200 Amp MPU/MPR (MO) | 4,500.00 | ea | 225/200 Amp Main Panel & Meter Replacement in Missouri | |
40 | Service Panel | 200 Amp MU (MO) | 3,500.00 | ea | 200 Amp Meter Upgrade/Replacement in Missouri | |
41 | Service Panel | 100 Amp MPR (IL) | 4,500.00 | ea | 100 Amp Main Panel & Meter Replacement in Illinois | |
42 | Service Panel | 200 AMP MPU/MPR (IL) | 4,800.00 | ea | 225/200 Amp Main Panel & Meter Replacement in Illinois | |
43 | Service Panel | 200 Amp MU (IL) | 3,800.00 | ea | 200 Amp Meter Upgrade/Replacement in Illinois | |
44 | Service Panel | Sub Panel Swap | 800.00 | ea | Add or Relocate a Subpanel | |
45 | Service Panel | Service Panel Clean-up | 1,200.00 | ea | Clean-up and Wiring Sorting Inside Service Panel | |
46 | Electrical | External Tap Box Install | 2,700.00 | ea | External Tap Box Installation | |
47 | Trenching | Dirt - Under 20ft Ground Mount or Roof Mount | 500.00 | ea | Dirt Trenching Under 20ft Flat Fee | |
48 | Trenching | Dirt - 21 to 100 ft Ground Mount or Roof Mount | 1700.00 | ea | Dirt Trenching Between 21-100 ft | |
49 | Trenching | Dirt - 101 to 200 ft Ground Mount or Roof Mount | 20.00 | ft | Dirt Trenching Between 101-200 ft - Price per foot | |
50 | Trenching | Dirt - Above 200 ft Ground Mount or Roof Mount | Quote | ea | Dirt Trenching Above 200 ft - Quote | |
51 | Trenching | Concrete - Under 15 ft Ground Mount or Roof Mount | 950.00 | ea | Cut Concrete for Trench Under 15 ft | |
52 | Trenching | Concrete - 16 ft or longer Ground Mount or Roof Mount | Quote | ea | Cut Concrete for Trench 16 ft or longer | |
53 | Trenching | Concrete - Return to Original | Quote | ea | Cut and Trench For Conduit Plus New Concrete | |
54 | Site Survey | Local Site Survey 0-60 Miles | 150.00 | ea | Local Site Surveys 0-60 Miles from Hub Location | |
55 | Site Survey | Travel Site Survey Over 60 Miles | 250.00 | ea | Travel Site Surveys Over 60 Miles from Hub Location | |
56 | Travel | Travel Time (MO, IL & KS) | 600.00 | ea | Travel from 100 to 200 Miles from Hub (St Charles, MO or Peoria, IL) | |
57 | Travel | Travel Time (MO, IL & KS) | 1,200.00 | ea | Travel from 200 to 300 Miles from Hub (St Charles, MO or Peoria, IL) | |
58 | Travel | Travel Time (MO, IL & KS) | 2,500.00 | ea | Travel Over 300 Miles from Hub (St Charles, MO or Peoria, IL) | |
59 | Travel | MPU/MPR Reschedule Truck Roll | 1000 | ea | Customer doesn’t show up or isn't’ available for work | |
60 | Travel | Installation Reschedule Truck Roll | 750 | ea | Customer doesn’t show up or isn't’ available for work | |
61 | SREC | SREC Bond Fee | Varies | ea | Held Upfront for Illinois Shines Program | |
62 | SREC | SREC Filing Fee | Varies | ea | Disclosure Filing Fee | |
63 | Other | Tree Trimming or Removal - Subject to increase if need be based on quote | 3,000.00 | ea | Tree Trimming or Removal by Third Party Company | |
64 | Other | Tree Trimming Admin | 200.00 | ea | Tree Trimming or Removal fee for Admin and Procedures Coordination within Helio | |
65 | Administration | Change Order | 500.00 | ea | Change Order After Plan Submittal | |
66 | Administration | Stage 1 Cancellation | 75.00 | ea | Cancellation after Site Survey – All Cancel Costs are Accumulative. | |
67 | Administration | Stage 2 Cancellation | 150.00 | ea | Cancellation after Engineering Submission – All Cancel Costs are Accumulative. | |
68 | Administration | Stage 3 Cancellation | 150.00 | ea | Cancellation after Permit Submission – All Cancel Costs are Accumulative. | |
69 | Administration | Stage 4 Cancellation | 150.00 | ea | Cancellation after NEM Submission – All Cancel Costs are Accumulative. | |
70 | Administration | Stage 5 Cancellation | 250.00 | ea | Cancel after Purchase Order – All Cancel Costs are Accumulative. | |
71 | Administration | Stage 6 Cancellation | 750.00 | ea | Cancellation at Truck Roll – All Cancel Costs are Accumulative. |